Mtkvari HPP

2021Year

Mtkvari HPP

2021Year

Implemented works:

.

Mold making-installation

.

Arrangement of the confluence construction with the tunnel

“Mtkvari HPP” located in Samtskhe-Javakheti is an exceptionally complex and interesting project in the portfolio of “ALL-P METAL”.

The company made and installed molds on the site. "ALL-P METAL" also ensured the arrangement of the construction connecting to the tunnel. The installed capacity of the HPP will be 53 MW, and the average annual output will be 251.5 million. is equal to sq.m.h.

 