COCA-COLA FACTORY

2019Year

COCA-COLA FACTORY

2019Year

Implemented works:

.

Production and installation of load bearing metal constructions

.

Installation of sandwich panels

.

Installation of water intake systems

"Coca-Cola" factory is one of the largest projects of "ALL-P METAL".  The company installed load-bearing metal structures and covered them with sandwich panels. "ALL-P METAL" also organized a water intake system.

 "ALL-P METAL" performed the works on the order of "Element Construction". According to the design-build principle, the largest Coca-Cola factory in Transcaucasia was implemented in 9 months. Large-scale works were carried out by utilizing several locations at the same time, during which more than 150 people were employed. The project consists of 18,500m2 production and warehouse building, 760m2 factory internal office space, laboratory and other technical areas.

 


Contact Form

+995 591 517 420
contact@all-p.ge
6v Libani str.
Tbilisi, Georgia
Thank you! Message is successfully sent!
Something went wrong!
© ALL-P Metal. All Rights Reserved.