"Coca-Cola" factory is one of the largest projects of "ALL-P METAL". The company installed load-bearing metal structures and covered them with sandwich panels. "ALL-P METAL" also organized a water intake system.
"ALL-P METAL"
performed the works on the order of "Element Construction". According
to the design-build principle, the largest Coca-Cola factory in Transcaucasia was implemented
in 9 months. Large-scale works were carried out by utilizing several locations
at the same time, during which more than 150 people were employed. The project
consists of 18,500m2 production and warehouse building, 760m2 factory internal
office space, laboratory and other technical areas.